PROJECT OVERVIEW
OWNER
University of Texas Longhorns Rowing
CONFERENCE
Big 12
VENUE(S)
Moody Center
DESIGNERS
Shield Lockers
MANUFACTURER
Shield Lockers
COMPLETION DATE
2022
FEATURES/SCOPE
69 Solid surface rowing wardrobe lockers
50 Solid surface rowing z-style lockers
PLAYER LOCKER SIZE
12" W x 15" D x 72" H
SHIELD'S FIRST ROWING LOCKER
In 2019, University of Texas Athletics began construction of the Moody Center, a brand new $375 million arena serving as the new home of Longhorns basketball and rowing. Gensler was named the architect on the project, ISEC the lead contractor, and Shield Lockers was tapped to manufacture the rowing lockers.
Shield worked collaboratively with the architect firm, general contractor, and UT Athletics to deliver 119 player lockers truly unique to the Longhorns. The lockers feature a solid surface build and a laminate back. Additional features include:
- Acrylic nameplate
- Solid surface door with digital lock
- Etched and color-infilled logo
- Integrated USB and power
In total, 119 lockers found their new home in the new Moody Center, giving the Longhorns a competitive edge for training and recruiting.
LOCKER REVEAL VIDEO
Reveal Day!
— Texas Rowing (@TexasRowing) October 10, 2022
The squad got their first looks at the new training facility! #HereComesTexas #HookEm pic.twitter.com/QYd6w83Bm0